欢迎访问山东途畅路桥工程有限公司网站!

冷再生机租赁

施工租赁热线

18264104888

您现在所在的位置 :首页 - 新闻中心 > 公司新闻

公司新闻

水泥撒布车施工注意事项!

来源:https://www.sddhfjx.com/ 日期:2020-08-29
  水泥撒布车施工注意事项
  Notes on construction of cement spreader
  (一)控制要点
  (1) Control points
  1、混合料含水量现场监测办法,一手抓起一把混合料,用力握实,然后松手让其自由落向地面,正常会立即摔散花,里面没有小团料。反复试验,介于落地松散和抱团之间的临界含水量即含水量,一般比试验单上的含水量数值多1%-2%。
  1. On site monitoring method for the best moisture content of mixture is to grab a handful of mixture with one hand, firmly hold it firmly, and then let it fall freely to the ground. Normally, flowers will be thrown immediately, and there is no small aggregate in it. Through repeated tests, the critical moisture content between the ground loose and agglomerated is the optimal moisture content, which is generally 1% - 2% more than the optimal moisture content in the test sheet.
  2、作业施工水罐车停车时一定要离开已施工或待施工水泥已摊铺路面,以防止漏水引起的局部水大。
  2. When the construction water tank truck stops, it is necessary to leave the pavement that has been constructed or to be constructed, so as to prevent local water from being large caused by water leakage.
                水泥撒布车租赁
  3、施工车辆停放时一定要错开第二天的段道预工作面,以防止耽误第二天的人工水泥摊铺,施工车辆不要停放在已完成施工的路面上。防治破坏新建结构和影响后期洒水养生。
  3. When parking the construction vehicles, it is necessary to stagger the first pre working face of the first section of the next day, so as to avoid delaying the artificial cement paving of the next day. It is better not to park the construction vehicles on the completed road surface. Prevent and control the damage to the new structure and affect the later watering curing.
  4、避免犯“过压”的错误,即过度压实。若达到材料的密实度后仍然继续碾压,则会破坏材料,反而降低其密实度。
  4. Avoid the error of "overpressure", i.e. over compaction. If the maximum compactness of the material is reached, it will destroy the material and reduce its compactness.
  5、水泥撒布车的施工作业应该在每天下午15:00—16:00之间结束,以便后续施工能在天黑前结束。
  5. The construction of cement spreader should be finished between 15:00 and 16:00 every day, so that the follow-up construction can be finished before dark.
  6、每天冷再生租赁机结束施工进行洗刀停车后,应通知操作手仔细检查车况并更换刀头,以免耽误第二天的施工进度。
  6. After the construction of the cold recycling leasing machine is finished every day, the operator should be informed to carefully check the vehicle condition and replace the cutter head to avoid delaying the construction progress of the next day.
  以上是关于水泥撒布车施工注意事项的介绍,希望对大家有所帮助,如您还有其他疑问欢迎咨询水泥撒布车租赁http://www.sddhfjx.com网站。
  The above is about the cement spreader construction precautions, I hope to help you, if you have other questions, welcome to consult our website.
  • 上一条:冷再生机出租正确操作使用流程?
  • 下一条:盘点选用冷再生机施工体现出的5大优势?
  • 相关产品: