欢迎访问山东途畅路桥工程有限公司网站!

冷再生机租赁

施工租赁热线

18264104888

您现在所在的位置 :首页 - 新闻中心 > 行业资讯

行业资讯

冷再生机租赁厂家施工准备工作

来源:https://www.sddhfjx.com/ 日期:2022-03-15
冷再生机租赁厂家在道路施工前要做好充分的准备工作,才能保障整个施工过程的顺利进行,需要做好哪些准备工作呢?
The leasing manufacturer of cold regenerator should make full preparations before road construction in order to ensure the smooth progress of the whole construction process. What preparations should be made?
1、要建立严谨、规范的内部约束、考核、激励机制,用制度管人,用规章管理工程。
1. We should establish a rigorous and standardized internal restraint, assessment and incentive mechanism, manage people with systems and manage projects with rules.
2、要补充调查工程沿线影响施工的因素,标注出平面位置图,并进行、论证,写出调查报告,作为修订施工方案、编制施工控制预算的依据。
2. The factors affecting the construction along the project shall be supplemented and investigated, the plane location map shall be marked, and the investigation report shall be prepared and demonstrated as the basis for revising the construction scheme and preparing the construction control budget.
3、施工图纸,吃透设计意图,澄清图纸中的问题,恢复定线和施工放样。对所有控制点进行加密、保护、记录。
3. Construction drawings, understand the design intent, clarify the problems in the drawings, and restore the alignment and construction setting out. Encrypt, protect and record all control points.
4、根据施工合同协议和现场调研认真编制施工控制预算,作为控制支出、进行成本预测分析、经济核算以及统计工程进度的依据。
4. Carefully prepare the construction control budget according to the construction contract agreement and on-site investigation as the basis for controlling expenditure, cost prediction and analysis, economic accounting and statistics of project progress.
冷再生机出租
Rental of cold regenerator
5、进行业务、技术培训和技术交底,使相关人员对工程的技术标准、操作规程、质量控制、资料整理有的了解。
5. Conduct business, technical training and technical disclosure to make relevant personnel have a comprehensive understanding of the technical standards, operating procedures, quality control and data sorting of the project.
6、建立工地试验室,并申请临时资质。对施工中拟使用的各种原材料取样试验,建立相关技术参数的数据库。
6. Establish a site laboratory and apply for temporary qualification. Sample and test various raw materials to be used in construction, and establish a database of relevant technical parameters.
7、绘制关键工序施工工艺流程图和试验操作规程、质量检查评定、计量支付、设计变更、事故处理等操作管理框图,并使图表上墙。
7. Draw the construction process flow chart of key processes, test operation procedures, quality inspection and evaluation, measurement and payment, design change, accident handling and other operation management block diagrams, and put the charts on the wall.
8、根据工期要求、技术标准、机械设备能力、材料供应、自然条件等进行综合分析,选择Z佳施工方案,完善施工组织设计。
8. According to the construction period requirements, technical standards, mechanical equipment capacity, material supply, natural conditions, etc., conduct comprehensive analysis, select the z-best construction scheme and improve the construction organization design.
  • 上一条:冷再生机在道路深翻中有什么优势?
  • 下一条:冷再生机为何使用那么频繁?
  • 相关产品: