浅层就地冷再生需要冷再生机怎么操作?

来源:https://www.sddhfjx.com/ 日期:2021-12-31
其实是相对全深式就地冷再生而言,全深式就地冷再生的施工深度为30-50公分左右,浅层就地冷再生只针对10公分左右的沥青层就行就地冷再生,这是两种就地冷再生直接的区别。
In fact, compared with the full depth in-situ cold regeneration, the construction depth of the full depth in-situ cold regeneration is about 30-50 cm, and the shallow in-situ cold regeneration is only for the asphalt layer of about 10 cm, which is the direct difference between the two kinds of in-situ cold regeneration.
,100%的利用旧路面材料。
First, 100% use of old pavement materials.
第二,施工速度快,施工周期短。
Second, the construction speed is fast and the construction period is short.
第三,总投资小,施工成本。
Third, the total investment is small to solve the construction cost.
第四,因为沥青温度低,实现。
 冷再生机出租
Fourth, because the asphalt temperature is low, energy conservation and environmental protection are realized.
详解冷再生的就地冷再生技术,沥青层(浅层)就地冷再生如何施工
Explain in detail the on-site cold regeneration technology of cold regeneration and how to construct the on-site cold regeneration of asphalt layer (shallow layer)
从全球设备提供商来看,主要是美国ASTEC集团旗下路泰克公司的再生设备,和德国维特根公司的就地再生设备,两者的相同点是都要在施工的过程中添加水泥等材料,两者的区别是路泰克设备使用乳化沥青进行再生,维特根公司设备使用泡沫沥青进行再生。
From the point of view of global equipment providers, it is mainly the regenerative equipment of Tektronix Inc of the ASTEC group of the United States, and the local regeneration equipment of Wittgen company of Germany. The same points between them are to add cement and other materials in the construction process. The difference between them is that Lu Tek equipment makes the emulsified asphalt to be regenerated, and the equipment of Wittgen company uses foam asphalt to regenerate.
我们看一下美国路泰克公司设备施工:
First, let's take a look at the equipment construction of lutec:
需要一台路泰克再生设备、乳化沥青罐车、拾料机、摊铺机和压路机等。
A lutec recycling equipment, emulsified asphalt tanker, picker, paver and roller are required.
施工前在原路面通过粉料撒布车撒布水泥。再生铣刨设备将路面进行铣刨,同时向铣刨室加入沥青,铣刨室内进行搅拌后输送到后方,通过拾料机和摊铺机进行摊铺,进行压实作业。
Before construction, cement shall be distributed on the original pavement by powder spreader. The recycled milling equipment will mill the pavement and add asphalt to the milling room. After mixing in the milling room, it will be transported to the rear, paved by the picker and paver, and finally compacted.