路面冷再生机施工如何保证品质?

来源:https://www.sddhfjx.com/ 日期:2021-07-23
1、工程项目工序调节
1. Project process adjustment
施工团队动工前仔细规划施工设计,经工程师审核后,严格要求按工程施工。在工程施工全过程中,需要检验设计及?方案贯彻状况,以确保工程施工一切正常开展。
The construction team carefully planned the construction design before the construction, and strictly required the construction according to the project after the engineer's review. In the whole process of project construction, it is necessary to inspect the design and? The implementation of the scheme to ensure the normal implementation of the project construction.
2、再生剂喷撒
2. Regenerant spraying
再生剂必需要计量精确,喷撒均匀分布。再生剂的喷撒要与复拌机的行驶快慢相合适,确保旧地面每平米的喷撒量精确。作业时,适度检验再生剂喷撒口是否阻塞,喷撒是不是畅顺。随时随地监控再生颗粒品质,依据路面地面原材料的变动,及时性调节再生剂,确保再生颗粒油石比在调节的范围。
The regenerant must be accurately measured and evenly distributed. The spraying of regenerant shall be appropriate to the driving speed of the mixer to ensure the accurate spraying amount per square meter of the old ground. During safe operation, properly check whether the spraying port of regenerant is blocked and whether the spraying is smooth. Monitor the quality of recycled particles anytime and anywhere, adjust the recycled agent timely according to the change of raw materials on the road surface, and ensure that the asphalt aggregate ratio of recycled particles is within the range of adjustment.
冷再生机出租
3、铣刨深度
3. Milling depth
铣刨薄厚要精确均匀分布,配置专人负责检验铣刨深度,随时随地检验,察觉铣刨深度偏差过大及时性调整,铣刨深度偏差为5mm,尽可能确保精确。不损坏原相结合面为宜;要是原地面上边层和下边层结合不佳,有疏松问题,必需将松散层全部铣刨干净,并且这时工程施工快慢适度减慢,以确保相结合位置有充足的温度,确保再生地面和原地面面层相结合优良。
The milling thickness shall be accurately and evenly distributed, and a special person shall be assigned to inspect the milling depth, inspect it anytime and anywhere, detect that the milling depth deviation is too large, and adjust it in time. The milling depth deviation is 5mm to ensure accuracy as much as possible. It is better not to damage the original joint surface; If the combination of the upper and lower side layers of the original ground is poor and there is a problem of looseness, all the loose layers must be milled and cleaned, and the construction speed of the project shall be moderately slowed down at this time, so as to ensure that there is sufficient temperature at the combination position and ensure the excellent combination of the recycled ground and the original surface layer.
4、再生颗粒实验
4. Regeneration particle experiment
严格要求按前述调节标准的项目及频率抽样实验,标准操作。每日及时性抽样实验,并及时性报告抽提实验结论,具体指导工程施工。
It is strictly required to conduct sampling test and standard operation according to the items and frequency of the above adjustment standards. Timely sampling test shall be conducted every day, and timely report shall be made to extract the test conclusions to guide the project construction.