冷再生机租赁对沥青路面改造的配置要求?

来源:https://www.sddhfjx.com/ 日期:2020-10-14
  十几年前在道路施工时,需要将旧的沥青路面铲除,造成了很大的浪费,而现在冷再生机出现 ,可以减少浪费。冷再生机是指沥青路面就地冷再生是利用一体化的再生设备、添加材料、一 次拌和成型工艺,通过新铺结构面层,构成旧路面改造新的一套完整体系。下面冷再生机租赁厂家就来讲解一下关于对沥青路面改造的配置要求和准备工作。
  More than ten years ago, in the road construction, the old asphalt pavement needs to be removed, resulting in a lot of waste, but now the emergence of cold recycling machine, can reduce waste. Cold recycling machine refers to the cold in place recycling of asphalt pavement, which is a complete set of new system of old pavement reconstruction by using the integrated recycling equipment, adding materials and one-time mixing molding process through the new pavement structure. The following cold recycling machine rental manufacturers will explain the configuration requirements and preparations for asphalt pavement reconstruction.
  准备工作:
  preparation:
  再生前的各项准备工作在施工前到位,确保工期正常进行。主要内容包括:人员准备、机 械准备、材料准备、交通协调及后勤保障。
  All preparations before regeneration shall be in place before construction to ensure normal construction period. The main contents include: Personnel Preparation, mechanical preparation, material preparation, traffic coordination and logistics support.
                    冷再生机租赁
  材料要求:
  Material requirements:
  水泥选用强度等级为32.5、初凝时间≥3h、终凝时间≤10h且≥6h硅酸盐或普通硅酸盐水泥 。水泥应具有良好的工作性、低水化、高后期强度、耐久性、耐腐蚀性和抗裂性能。
  Portland or ordinary portland cement with strength grade of 32.5, initial setting time ≥ 3h, final setting time ≤ 10h and ≥ 6h. Cement should have good workability, low hydration, high late strength, durability, corrosion resistance and crack resistance.
  机械要求:
  Mechanical requirements:
  工程施工过程通过再生机组来完成,再生机组包括:冷再生主机、水泥稀浆车、平地机、 压路机等。
  The construction process of the project is completed by regeneration unit, which includes: Cold Recycling host, cement slurry truck, grader, roller, etc.
  人员要求:
  Personnel requirements:
  工程技术人员及机械操作人员应经过冷再生培训并经过考核合格后方可上岗。
  Engineering and technical personnel and mechanical operators shall receive cold regeneration training and pass the examination before taking up their posts.
  工程协调:
  Project coordination:
  作好施工总体计划,采取不中断交通半幅施工,作好施工期间交通疏导工作,准备施工作 业面的遮挡。
  The overall construction plan shall be made, the half width construction without interruption of traffic shall be adopted, the traffic dredging work during the construction period shall be well done, and the shelter of the construction working surface shall be prepared.
  以上是关于冷再生机对沥青路面改造的配置要求的介绍,相信大家都有所了解了,如想了解更多内容欢迎点击我们的http://www.sddhfjx.com网站。
  The above is about the configuration requirements of cold recycling machine for asphalt pavement reconstruction. I believe you all know something about it. If you want to know more, please click our http://www.sddhfjx.com Website.